Skip to Content

OASE AQUAMAX ECO PREMIUM 3000 / 12V (OA88675)

https://www.yourpondfarm.com/web/image/product.template/7665/image_1920?unique=aa4e06a
  • Item: 88675
  • Volts: 100 - 120V / 50-60 HZ
  • Amps: 8.5
  • Watts: 95
  • Inlet: 2"
  • Outlet: 2"
  • Max Head: 10.5'
  • Max Solids Size: 0.375
  • Cord Length: 8' + 26'
  • Hose Size: 1", 1.25", 1.5"
  • Outlet Fitting: 1" 1.25", 1.5", Sch40 1.5" - 2" adapter
  • Warranty: 3-year + 2
  • Dimensions: 11"W x 6½"H

0.00 0.0 USD 0.00

Register for pricing

(0.00 / Units)
  • OA88675

This combination does not exist.

SKU: OA88675

Product Details

  • Synchronous electronic 12 volt pumps are designed for applications where submersible line voltage pumps are prohibited

  • OASE AquaMax Eco Premium 12 volt is an energy efficient pump are perfect for use inline for recreational ponds or in submersible applications

  • Environmental Function Control (EFC) automatically shuts off the pump if dry run or clogged to prevent pump damage

  • Pump can be used in-line by removing large-surface, wrap-around pre-filter pre-filter and using mounting bracket to secure

  • Pump features a grounding plate for unparalled safety

  • 33' 12 volt extension cables available

OASE Synchronous electronic 12 volt pumps are designed for applications where submersible line voltage pumps are prohibited. The OASE AquaMax Eco Premium 12 volt is an energy efficient pump designed specifically for inline use for recreational ponds or in submersible applications. The Environmental Function Control (EFC) automatically shuts off the pump if dry run or clogged to prevent pump damage. The pump can be used in-line by removing large-surface, wrap-around pre-filter pre-filter and using mounting bracket to secure. The pump features a grounding plate for unparalleled safety. The 33' 12 volt extension cables are available for the AquaMax Eco Premium 12 Volt. The AquaMax Eco Premium 12 Volt has 100-120V / 50-60 Hz and a wattage of 95 with a 2” inlet and outlet. Its maximum solids size is 0.375” and has dimensions of 12.5”L x 11”W x 6.5”H. It outlet fitting sizes are 1”, 1.25”, 1.5” and a Sch40 1.5”-2” adapter. The AquaMax Eco Premium 12 Volt qualifies for the Clear Water Guarantee when paired with the BioSmart 10000 and the Vitronic 36 UVC, as well as the BioTec ScreenMatic² 18000 and the Bitron C 55. It is also compatible with the BioTec ScreenMatic² 24000 and Bitron C 110.